除此之外,还要对零部件制造及整机装配进行严格控制。
Besides, the manufacturing of parts and the assembling of the whole set should also be strictly controlled.
大功率管在整机装配、调试及运行过程中常出现一些质量问题。
The great power tube often brings about some quality problems in the process of the whole machine assembly, regulation and operation.
该部件制造装配完成后,出厂或进行整机装配前必须对产品总成进行检测。
After completing its assembly, the product must be tested before shipment or assembly of overall machine.
应用推荐