其次,在实际电网中,并联电容器组的配置包括确定并联电容器组的组数、各组电容器的容量、安装位置及其投切时刻。
Secondly, in the actual electric network, configuration of shunt capacitors includes how to confirm their group number, capacitors, installation position and switched time of each group.
这个问题的答案是积极的假如为“投同意票的组的数量高于普通的组数的一半。”
The answer to the question was positive if the number of groups that had voted "for" was greater than the half of the general number of groups.
本文以苏州数家直投广告报纸作为研究对象,对它们进行分析,归纳出该行业特点。
This thesis does a research on several Suzhou DM presses, comparing one to another, analysing them, and making a conclusion of their own feature respectively.
应用推荐