放淤试验工程“淤粗排细”的目标基本得以实现。
The test target of "depositing coarse sand and discharging the fine" is basically achieved.
通过模型试验对黄河小北干流连伯滩放淤试验工程的各关键技术分别进行了分析。
The key techniques for the Lianbotan experimental warping project of the lower north main-stem of Yellow River are analyzed through the model test concerned respectively.
从黄河下游放淤固堤工程的实际问题出发,文章分析了吹填土的沉降固结性能。
This paper has analyzed the characteristics of settlement and consolidation of soil warped by using a dredged-fill machine for strengthening the dykes along the lower Yellow River.
应用推荐