铺完厨卫地砖后应该放水检查,看看地漏排水是否顺畅,以去掉地漏上盖后的排水速度为准。
After finish paving hutch defends floor tile, look at the floor drain the water should check whether the drainage smooth, to remove floor drain cover drainage speed shall prevail.
当倾斜长壁开采的综放工作面初采范围处于向斜构造区,造成初采放水无法利用已有巷道形成自流放水,必须考虑动力排水或其他的放水方式。
When long wall mining to the dip in fully-mechanized coal winning working face is inclined area, we may can't use existing drift draw off water.
应用推荐