目前,大直径泥水平衡顶管掘进已成为城市给排水水管、电力管线工程等首选的施工方法。
At present the large diameter slurry pipe jacking is the preferred construction method in project of urban water supply and drainage pipe and electric power pipe.
砂柱下部饱和并处于静水平衡状态,在底部为定水头的条件下进行排水。
The sand column, saturated at its lower portion and initially in the condition of hydrostatic equilibrium, is drained at its bottom at constant head.
应用推荐