介绍了株六复线改造因线路拨移、线路交叉换侧、桥梁铺架、车站封闭等引起接触网施工方案的过渡。
Introduces OCS construction transitional plan such as railway line-moving, line-crossing and side-exchanging, bridge and track laying, station closing up etc. on Zhuzhou-Liupanshui double track lines.
通过头向两侧倾斜再复位,来拉伸脖子的肌肉,保持10秒钟。做完一侧换另一侧。
Stretch the neck muscle by tilting your head to the side and slightly back, hold for 10 seconds. Do it again to the other side.
然后再用同法换作健侧。
应用推荐