在层间隔离封隔器坐封并测试后,操作人员将TORRENT充填的服务工具定位在最下层的位置上来对此层进行挤压充填作业。
After the zonal isolation packers were simultaneously set and tested, the TORRENT service tool was positioned at the lowermost zone to perform the frac-pack stimulation.
在完成充挤压充填作业之后上提服务工具,一次性关闭本层留井管柱上的监测滑套和压裂滑套。
Upon completion of the treatment, the service tool was repositioned to close the monitoring sleeve and the frac sleeve in one upward movement.
应用推荐