按照常规程序,在手术之前那些器官必须经过检验,检验结果应该送到器官移植的医务人员手中。
According to regular procedure, those organs need to be tested before surgery and the result should be delivered to transplant staff.
为保证计量准确,必须按照JJG1021-2007《电力互感器》和DL/T448-2000《电能计量装置技术管理规程》进行检验。
To ensure accurate measurement, must be in accordance with JJG1021-2007 "power transformer" and DL / T448-2000 "power metering device technical management procedures" for testing.
故应严格按照铝母线的质量检验标准和规程的要求,做好质量控制工作。
Therefore, the requirements of the quality inspection standards and norms on aluminum busbar shall be strictly obeyed for the good control of quality.
应用推荐