主拱为桁架式双拱肋,钢管拱纵向分13段制造,采用无支架缆索吊机安装、钢绞线斜拉扣挂施工。
The steel pipe arch was manufactured in 13 segments vertically, erected by cable crane without support and clasped by diagonal tension steel strand.
分别介绍了该缆索吊的缆索系统、主塔架系统、扣挂系统和锚固系统的设计、计算及施工方法。
The design, calculation and construction method for cable crane system, main pylon system, fasten and hang system and anchor system are introduced respectively in this paper.
拱肋纵向分7段预制,采用无支架缆索吊机安装、钢丝绳斜拉扣挂法施工。
The arch rib have been fabricated longitudinal by 7 segments, and used the non-support cable crane installation and the steel cable diagonal-tension method.