在两正洞拱部施工的时候,左右洞拱顶沉降约占最终沉降的70%。
The settlement of the two tunnels' arc crown occurs during the construction of arc part covers 70% of the final settlement.
应用有限元数值方法,对连拱隧道“三导洞法”施工时围岩和结构的受力、变形规律进行了分析。在两正洞拱部施工的时候,左右洞拱顶沉降约占最终沉降的70%。
The regularity of stress and strain of surrounding rock and support structure when using(3-heading) excavation method to construct double-arc tunnel is carried out by FEM numerical method.
第二部分逐渐上升,延伸到坚固而圆拱的腰部。
The second rises gradually and continues into a solid and well-arched loin.
应用推荐