该拟建中学包括二栋六层的教学楼,其结构形式均为钢筋混凝土框架结构。
The proposed building is designed to the reinforced concrete frame structure, including two six-story teaching buildings.
模拟了某拟建中水下公路隧道,在不同隧道顶板厚度时的围岩应力、位移、塑性区的分布及大小。
Dispersion ranges of stress, displacement and plastic region of different coping thickness of wall rock of an underwater highway tunnel are simulated.
通过对拟建中的西安市第四污水处理厂初沉池入流污染物的沉淀试验,得到不同水深和沉淀时间下的ss去除率曲线。
The settling test of influent sample was conducted in Xi"an No. 4 Wastewater Treatment Plant under construction. The settling curve of SS is obtained under different water depths and retention time."
应用推荐