一般认为锚杆(索)抗滑桩在锚杆(索)拉力、滑坡推力、桩前滑体抗力的作用下绕锚固点(锚拉力作用点)保持力矩平衡,锚固点为一铰支点。
It is a balance system that the anti-slide pile is exerted by three kinds of force, they are the tensile force of anchor, the thrust of sliding mass, the resistance of soil and rock.
本文提出了锚拉抗滑桩锚拉力计算的桩顶位移控制法,计算控制桩顶位移所需的最小锚拉力。
The thesis puts forward the pile-top displacement control method, and it can account the least force of the anchor wire on anti-slide pile.
此外,超深开挖可在桩身中产生较大的拉力,桩身中下部钢筋不能随意减少。
In addition, deep excavation can cause considerable tension force in the pile, which means that the reinforcing steel bars in the lower part of the pile should not be reduced at discretion.
应用推荐