实施户表改造后,在给用户解决了实际问题的同时也给供电部门的线损带来影响。
After implementing the reconstruction of household electricity meters, some actual problems have been solved for users, but at the same time there is influence on line loss of power supply department.
有的分户热计量示范项目安装了500多块机械式户表,运行不到一个月,竟有200多块热表被污物堵死。
In some project there are 500 PCS heat meters installed, in which about more than 200 heat meters were blocked by dirt after less than one month of operation.
但目前的人工抄表方式已不能满足“一户一表”政策实施以及配网需求侧的自动化管理的需要。
But at present, the artificial way to check ammeter can't meet with the implement of the system and the need of automatic management.
应用推荐