工程中采用了大跨度次梁预应力楼盖结构,有效地降低梁的截面高度,确保层高和建筑物总高度的要求,此外还采用了超长混凝土结构无缝设计等新技术。
The project has used large-span secondary girder pre-stressed ceiling structure, which effectively reduces the beam cross-section height and ensures the total height and building height requirements.
进气道出口截面上未发现因附面层吸入而造成的低总压区,这说明高度与当地附面层厚度相当的进口鼓包能有效地隔除附面层中能量较低的气流;
The bump which is equal to the local boundary layer thickness in height can divert the boundary layer effectively. As a result, no obvious low total pressure zone is found at the outlet of the inlet;
应用推荐