复杂需求的沟通不足常常会导致项目交付延期,超过预算,或者缺失业务所需要的特性。
Poor communication of complex requirements often results in projects that are delivered late, over budget, or without features needed by the business.
我们已经在我们使用的知识中发现了一个缺口,这个认识的缺口或者缺失或者不足必须得到纠正和弥补。
We have found a gap in the knowledge of the use of the knowledge and this gap or this shortage or lack of understanding must be corrected and put right.
当右脑探测异常情况和挑战左脑的能力因为某种原因受损或者缺失(例如由于中风的缘故)时,病感失认症就产生了。
When the right brain's ability to detect anomalies and challenge the left is somehow damaged or lost (e.g., from a stroke), anosognosia results.
应用推荐