悬挑式脚手架一般有两种:一种是每层一挑,将立杆底部顶在楼板、梁或墙体等建筑部位,向外倾斜固定后,在其上部搭设横杆、铺脚手板形成施工层,施工一个层高,待转入上层后,再重新搭设脚手架,提供上一层施工;另外一种是多层悬挑,将全高的脚手架分成若干段,每段搭设高度不超过20m,利用悬挑梁或悬挑架作脚手架基础分段悬挑分段搭设脚手架,利用此种方法可以搭设超过50m以上的脚手架 ,悬挑脚手架外立面须满设剪刀撑。
脚手架施工的安全技术管理_建筑工程管理论文 关键词:悬挑脚手架;施工;安全技术管理 [gap=536]Keywords: cantilever scaffold; The construction; Security technology management
基于22个网页-相关网页
楼悬挑脚手架施工方案 SJHD
结合工程实例。介绍了大跨度钢管悬挑脚手架的设计与施工。
Based on the project example, the design and construction of large-span steel pipe overhanging scaffold are introduced in this paper.
因此,高层建筑结构施工中,分段悬挑搭设的扣件式钢管脚手架应用得非常普遍。
Therefore, high building structure construction, segmentation cantilever of the fastener type steel tube scaffold built very common application.
当施工条件不允许搭设落地式外脚手架时,经过计算采用悬挑式外脚手架,缩短了工期,满足了业主的要求。
If console scaffold is impossible to be put up in some construction condition, after calculation, we found using suspension style scaffold could reduce the construction time and meet owners needs.