具有学习效应的总完工时间流水线排序问题与仿真-论文同学网 关键词:排序,流水作业,学习效应,总完工时间 [gap=1760]Keywords: scheduling,flow shop,learning effect,the total completion time
基于52个网页-相关网页
文章详细信息 关键词: 随机排序;;总完工时间;;反问题 [gap=944]Keywords: stochastic scheduling;total weighed completion;inverse problem
基于6个网页-相关网页
加权总完工时间 total weighted completion time ; weighted completion time
极小化加权总完工时间 the total weighted completed time
总加权完工时间 total weighted completion time
Flow shop scheduling problem with total flowtime minimization is animportant manufacturing system widely existing in industrial environments.
以总完工时间为目标的Flow shop调度问题是一个重要的制造加工系统,广泛应用于工业环境中。
参考来源 - 流水调度问题的启发式求解·2,447,543篇论文数据,部分数据来源于NoteExpress
最小化加权总完工时间的单机排序问题。
Minimize the total weighted completion time single machine scheduling problems.
研究了可中断的带有到达时间的使总完工时间最小的恒速机排序问题。
A preemptive uniform machine scheduling problem with arrival time and minimum makespan is studied in this paper.
研究具有链式约束的单机随机排序问题,目标函数为加权总完工时间的数学期望。
This paper discusses the stochastic scheduling on a single machine to minimize total weighted completion time subject to precedence constraints of chains.
应用推荐