The routing system is divided into two steps: global routing and detailed routing.
布线系统分成两步:总体布线和详细布线。
参考来源 - 芯片级多层布线关键技术研究This paper is a tutorial on timing driven design technology of high speed IC. Issues which are covered include: timing analysis, timing optimization in high level and logic synthesis, timing driven placement & global routing and controlling clock skew.
本文叙述了实现高速IC的设计技术,包括延时分析技术,高层次综合、逻辑综合延时优化技术,延时优化驱动布局与总体布线技术,控制时钟偏差技术以及各种技术的结合应用等。
参考来源 - 高速IC设计技术 in C·2,447,543篇论文数据,部分数据来源于NoteExpress
最后文章研究了同时考虑串扰和时延的综合性能驱动的总体布线算法改进。
In the end of this paper, problems such as cross-talk and delay driven (integrated performance driven) are also disc...
文章介绍了一个可以同时考虑时延约束和拥塞度优化的VLSI总体布线新方法。
Introduced in this paper is a new approach for VLSI interconnect global routing that can optimize both congestion and delay, due to routing topology flexibilities.
每间房有多少电源插座?总体布线够否?或对新租户来说布线是否是一个大的花费。
How many electrical outlets are there in each rooms? IS the overall wiring adequate? Or will wiring be a major expense for the new tenant?
应用推荐