无调节水库的电站称为径流式水电站。此种水电站按照河道多年平均流量及所可能获得的水头进行装机容量选择。
提出了径流式水电站安装时序容量的概念和计算方法。
This paper introduces the concept and the method of calculating installation sequential capacity for run-of-river hydropower stations.
低水头径流式水电站具有许多独特的优点。因此,它的开发已日益受到人们的重视。
Attention has been increasingly paid to the development of low-head run-of-river hydropower stations due to their unique advantages.
从对计算结果的整理分析得出了对低水头径流式水电站优化运行特有问题的一般认识。
By analyzing the results of these calculations, several basic ideas of the special problems of low-head runoff river hydroelectric plants are obtained.
应用推荐