研究表明在膜结构的找形阶段应适当地加大结构的初始预张力,以减小由于支座变形所造成的预应力损失。
It is found that the prestress should be increased to reduce the loss of prestress with the deformation of the support.
张力控制由于材料存在拉伸变形,要得到系统的精确模型比较困难,适合采用PID控制方法。
It is difficult to get a precise system model as the material will elongate, so it is suit to choose PID control in tension control.
基于不变形预张力的基本概念,建立了斜拉桥成桥状态的多目标、多约束的优化模型,并通过有限元程序求解成桥索力。
Based on the basic concept of the un-deformed pretension of cable, the optimization model of finished state with multi-objective and multi-constraint is used.
应用推荐