·2,447,543篇论文数据,部分数据来源于NoteExpress
为保证开挖面稳定及控制地面沉降,土压平衡盾构掘进时必须合理匹配各施工参数。
For EPB(Earth Pressure Balance)shield tunneling, one must properly choose driving parameters to maintain face stability and control ground subsidence.
超前注浆管棚支护是一种避免在软土地层或含水地层中盾构隧道开挖面失稳的有效技术。
The advanced pipe grouting is an effective technique to avoid the instability of shield-tunneling faces in soft or water-bearing ground.
提出了根据地面沉降值从理论上判断开挖面稳定性的方法。
Besides, a method based on settlement value is put forward as a criterion for face stability judgment.
应用推荐