这个废料坑位于一处水力压裂钻探场,它再次揭示了对废料坑的再次开采。
This image shows another waste pit at a hydro-fracing drill site. Again, we see a waste pit for drilling mud.
在厄瓜多尔舒舒分地61区的热带丛林中,一排排的树木和生锈的带刺铁丝围栏之后,藏匿着一处石油废料倾倒坑,周围肮脏的地上尚留有车辙。
HIDDEN behind a row of trees and a rusted barbed-wire fence on a rutted dirt road in the Ecuadorean jungle, Shushufindi 61, a pit in which oil waste is dumped, is hardly a beauty spot.
用重夯按一定夯距夯击软土地基,在夯击坑中填充建筑废料,再进行夯实。
We should ram the soft ground with heavy rammer awarding to certain distance, fill up the pit with construction wastes, and tamp again.
应用推荐