本文以杭州湾跨海大桥北航道非通航孔桥为工程背景,对大跨度预应力混凝土箱梁锚固区混凝土的应力应变分布特征进行了分析研究。
A study of the stress and strain distribution of anchorage zone in a long span PC box girder was undertaken in the background of Hangzhou Bay Bridge project.
本文根据孔壁应力解除法获得的量测应变,提出了采用最优化方法直接确定岩体的泊松比和原始地应力。
This paper proposes that Poisson's ratio of rock mass and in-situ stress are directly determined using optimization method according to measured strains obtained from bore hole stress relief process.
泡孔尺寸不仅影响着材料的屈服强度和塑性模量等,还影响着材料的应变率敏感性。
Cell-size has a significant effect not only on the crushing stress and plastic modulus of aluminum foam, but also on the strain-rate sensitivity of material of this kind.
应用推荐