最后是行洪区得两个口门一般是通过爆破或人工扒口打开,其开启顺序对干流河道水位、流量情况也有一定影响。
Finally, opening the flood diversion work's gate is through blasting or manpower, and the open order influences the discharge and elevation of water in main river.
水布垭水电枢纽拟建于清江干流深切峡谷地段,重力是决定坝址区岩体稳定与否的关键因素。
The Shuibuya hydroelectric project will be built in gorge morphology on Qingjang River, the gravitation is key factor which decides whether the rock in dam site is stable or not.
溪洛渡水电站是金沙江干流上拟建的一座仅次于三峡的大型水利枢纽,电站坝址区水文地质条件复杂。
Xiluodu hydropower station is a proposed large scale key water control project located on the mainstream of Jinshajiang river, second only to the Three Gorges project.
应用推荐