我校完全具备建立工软(SUTsoft)的主客观条件:一方面,我们信息学院的师资力量强大,导师的水平高项目多,本科生研究生素质好人数多,还有自己的软件学院,再加...
基于24个网页-相关网页
公路软基工后沉降的控制一直是工程技术人员特别重视的问题之一。
The control of subsidence of the soft soil base after construction is a key problem.
采用最新的软、硬件技术,充分考虑火电厂热工自动控制应用的需要,开发了基于现场总线的新一代分散控制系统。
To meet the demands of heat engineering automation control in power plants, a new distributed control system based on field bus is developed by adopting the latest software and hardware techniques.
通过考虑差异沉降、工后沉降和路基稳定等因素,选用粉喷桩的处理方法处理软基。
Considering some factors of differential settlement and settlement after construction and roadbed stability, DJM column that treats the soft ground is chosen.
应用推荐