铁轨六个月前就已完成,且(工程费用)比预算低了将近10%。
It was finished six months early and nearly 10% under budget.
在四川盆地的地震勘探工程中,地震资料野外采集施工费用,即地震工程预算中的直接工程费,占整个地震勘探工程成本的80%左右。
The expense for the field acquisition of seismic data, i. e. the direct cost in the budget of the seismic engineering, accounts for about 80% of the whole engineering cost of seismic exploration.
便于工程预算较法兰式连接节约总工程费用地20%,施工无需电源、氧气、明火。
It's easy for project budget and can save 20% of the total charge compared to flange connecting, the construction don't need the power supply, oxygen, and fire.
应用推荐