本文介绍了自动化驼峰工程调试与开通的程序及对静态和动态试验重点项目的内容、方法。
This paper introduces the procedure of adjusting and opening and the contents and method of key item of static state and dynamic testing of automation hump engineering.
工程技术部负责按《检验、测量和试验设备控制程序》规定要求校准实验设备。
The Engineering & Technical Department is responsible to calibrate the test equipment according to the "Inspection, Measuring and Test Equipment Control Procedure".
通过对管线系统压力试验的技术要求、施工程序的总结性介绍,对试压过程中可能出现的问题作了探讨。
This paper gives a summary introduction to technical requirements and construction procedures for pressure test, and discusses the technical problems which may occur during pressure test.