介绍了一个采用螯合沉淀法处理电镀废水的典型工业实例。
A typical industrial example of chelating precipitation to treat electroplating wastewater is reported in this paper.
并利用一工业实例说明如何应用夹点技术进行现有换热网络的分析和改造设计。
An industrial example is presented to show how to use pinch technology to analysis the existing heat exchanger network and to retrofit it.
仿真研究给出了基于新息灰理论的工业实例建模过程和故障预测结果,并与BP神经网络方法的计算结果进行比较,验证了新息灰预测方法的有效性与实用性。
The modeling procedure of emulation based on FIGPM is presented, and the prediction result is compared with BP neural networks. It is proved that IGPM has good practicability and validity.
应用推荐