对崆峒水库输水洞平板闸门改建为锥形阀后的消力池进行了模型试验研究。
After the Kongdong reservoir water hole plate gate rebuild into a cone valve, the stilling basin, model test was conducted.
方法:随机抽取平凉市崆峒区不同公众共160人,进行CPR问卷调查与CPR技能的培训。
Methods:Randomly selected total 160 people from the different public that were carried out the survey questionnaires of CPR knowledge and the skills of CPR training.
通往崆峒山主景区的路有四条:第一条是乘船过弹筝湖沿前山一千三百多个台阶上山到达中台停车场;
Road A: take the boat from the Lake Tanzheng and climb up through over 1,300 steps to the Zhongtai Park Lot.
应用推荐