为了优化三峡电站进水口体形,试验研究采用了与传统大进水口不同的小进水口体形方式,并将进水口的喇叭口段布置成对称状。
By means of test research, a small sized inlet with a symmetrical bell-mouth form instead of traditional large sized one will be adopted for the TGP's hydropower station.
主要论述三峡工程电站进水口的型式及其实验结果。
The paper is intended to describe the power intake schemes in the Three Gorges project and their experiment results.
应用推荐