一个集成的软件开发平台和一致的,结构化的过程以及良好的实践对减小风险和成本,确定大型项目的时间进度都是至关重要的。
An integrated software development platform and consistent, configurable processes and best practices are essential to mitigate risk to cost and schedule across these large projects.
交易部门对风险资产的最大可能损失做了估计,对之进行对冲,然后将如此计算的最小风险净值记录在案,如此这般,却将风险毛值里的巨大的长尾风险疏忽性地掩盖起来。
Trading desks would estimate the maximum possible loss on risky assets, hedge it and then record the net risk as minimal, inadvertently concealing huge tail risks in the gross exposure.
对这两种大风仓小风斗进行的数值模拟表明,改进后的供风系统能有效地提高横向配风的均匀性。
A numerical simulation of the above two kinds of air supply system indicates that the improved air supply system can effectively enhance the uniformity of transversal air distribution.
应用推荐