应指定接地故障断路器的电气预防维护任务,此项任务要求对装置进行定期测试。
There is an electrical preventive maintenance task assigned to the Ground Fault Circuit Interrupter, that requires periodic testing of the unit.
已完成的负载测试的负载测试结果包含从受测计算机的日志中定期收集的性能计数器样本和错误信息。
The load test result for the completed load test contains performance counter samples and error information that was collected in a log periodically from the computers-under-test.
应用推荐