建筑物施工前,在施工现场对建筑物定位,形成至少4个以上定位点,用钢管或混凝土桩表示出来,用来指导后续施工,称为定位桩
n. spud
misc. gauge pile
本文主要研究波浪交变载荷对挖泥船定位桩疲劳强度的影响。
This paper mainly study the influence of wave alternating load on the strength of cutter suction dredger spud.
本文从绞刀、泥泵、定位桩装置及排泥管等四个方面,论述了提高绞吸式挖泥船生产效率的途径。
This paper describes how to increase the productivity effect of cutter-suction dredgers in the fields of cutting force, dredging pump, gauge pile and exhaust pipe.
采用主动式智能翻转机构,使拾桩更加快捷、高效,钢板桩定位更加准确,操作更加简易,工作效率可以提高30%。
With Active Smart tilt system so pile picking up is faster and more efficient, more accurate positioning steel sheet pile with a more simple operation, efficiency can be increased by 30%.
应用推荐