... 完整的密封数据表 appropriate completed data sheets 完钻 drilled well 完钻井口数 drilled well number ...
基于20个网页-相关网页
There are no accidents during drilling operations. Well logging is completed without repeat with the bottom hole temperature up to 236℃,which is measured in 24 hours after well completion.
该井钻井施工顺利,有效防止和解决了井壁掉块和高温的问题,全井没有发生任何井下复杂情况和钻井事故,完井电测一次成功,完钻循环静止24 h后实测井底温度高达236℃。
参考来源 - 泌深1井钻井设计与施工·2,447,543篇论文数据,部分数据来源于NoteExpress
近日,中国石化重点探井马深1井顺利完钻,完钻井深8418米,创亚洲第一超深钻井纪录。
Recently, the important exploration well Mashen 1 is successfully drilled with the depth of 8418 meters, which creates the first ultra-deep drilling record in Asia.
该井的顺利完钻和新钻井技术的成功应用也为其他超深井施工提供了宝贵的经验。
The successful drilling and application of new drilling technology provide valuable experience for drilling other ultra-deep Wells.
完钻后,只留一个泥浆工程师在井上。
After the well finish, only keep one mud engineer at the rig.