本文详细地介绍了系统的总体方案、硬件设计、控制运算、软件设计以及安装和调试的全过程。
This article introduces overall plan for the system, the hardware design, the control operation, the software design as well as the entire installment and debugging process.
进行了致动器时域特性测试和控制系统的安装调试。
The testing of time domain property for the actuator, the installation and debugging for the controlling system were completed.
介绍了集中空调系统安装调试阶段的水质控制方法。
Presents the water quality control measures for central air conditioning systems during installation and commissioning periods.
应用推荐