简单介绍了10MW高温气冷堆(HTR-10)电力系统的设计特点,并用故障树法对HTR-10交流安全母线供电的可靠性进行了定量的理论分析。
The essential principle and implementation of the bi directional detector for Fuel Handling System (FHS) in 10MW High Temperature gas cooled Reactor (HTR 10) are presented.
母线保护装置的可靠性关系到电力系统的安全、稳定运行。
The reliability of busbar protection has influenced the safe and stable operation of electric power system.
安全地接地极与PDP中安全地汇流母线的连接电缆大于等于100平方毫米?。
The connecting cable from the ground rod to the SG bus bars in PDP cabinet is equal to100 Square millimeters or larger ?
应用推荐