铁路信号中的可编程电子系统(PES)是一种安全相关系统。 这类系统更注重失效-安全,而不仅仅是可靠性或可用性。
Programmable electronic system (PES) used in railway signaling is a safety related system, which lays more stress on the ability of fail safe, not merely on the reliability or availability.
相反,他把这一案例描述成“健康和安全措施的完全失效”的一个例子。
Instead he describes the case as an example of a "total failure in health and safety procedures".
管理评审的输入必须包括对实际的和潜在的现场失效及其对质量、安全或环境的影响的分析。
Input to management review shall include an analysis of actual and potential field failures and their impact on quality, safety, or the environment.
应用推荐