位于大铲岛西面,大铲岛与?洲岛之间的水域,水道北接矾石水道南端,南接北航道。
Lies to the west of dachan island between dachan island and mazhou island northward to the south end of fanshi fairway and southward to the north channel.
位于大铲岛西面,大铲岛与?洲岛之间的水域,水道北接矾石水道南端,南接北航道。
Lies to the west of dacha n island between dacha n island and mazhou island northward to the south end of fanshi fairway and southward to the north channel.
本文以杭州湾跨海大桥北航道非通航孔桥为工程背景,对大跨度预应力混凝土箱梁锚固区混凝土的应力应变分布特征进行了分析研究。
A study of the stress and strain distribution of anchorage zone in a long span PC box girder was undertaken in the background of Hangzhou Bay Bridge project.
应用推荐