摘要采取长时间浸水马歇尔试验和多循环冻融劈裂试验方法,对掺加了水泥、抗剥落剂的安山岩集料沥青混凝土水稳定性能进行研究。
Long term immersing Marshall test and frozen-thaw cycle test were used to investigate the anti-stripping performance of andesite asphalt mixture using cement and anti-stripping agent.
高速公路的路面结构多采用沥青或水泥混凝土路面结构。
Highway pavement structure adopts more asphalt or cement concrete pavement.
采取长时间浸水马歇尔试验和多循环冻融劈裂试验方法,对掺加了水泥、抗剥落剂的安山岩集料沥青混凝土水稳定性能进行研究。
Long term immersing Marshall test and frozen-thaw cycle test were used to investigate the anti-stripping performance of andesite asphalt mixture using cement and anti-stripping agent.
应用推荐