四个处理槽,每个装有10磅产品,能处理大约一百万加仑污水。
Four treatment tanks, each with a 10-pound load of the product, can treat about a million gallons of water.
另外,给出有多重处理槽工序问题的模型和求解方法。
Besides, both a model and a solving method are given for multi-tank.
难题浸析区域是厌氧菌处理槽处理系统最易出现故障的部分。
The leaching field is the part of the septic tank disposal system most prone to failure.
应用推荐