go top

有道翻译

壁代

Bi Dai

以上为机器翻译结果,长、整句建议使用 人工翻译

双语例句

  • 、炉腰护身下部区域,采用了软水密闭循环冷却系统第3新型冷却和组合薄炉衬技术

    Closed loop soft water cooling system, 3rd generation new type cooling stave and thinner-synthetic lining have been used in bosh, belly and lower stack.

    youdao

  • 十国时期(公元907年至960年),彩绘继续君主陵墓中盛行。彩绘常见于仿门梁建筑结构上。

    During the Five Dynasties and Ten Kingdoms period (907-960), rulers continued to decorate their tombs with murals. The colored murals are painted over doorframes and structures of imitation wood.

    youdao

  • 桥梁依据实验结果提出模拟预应力钢索与索道之间接触压力荷载实用的方法。

    Taking an arch foot as an example, a practical met hod was proposed to simulate the contact pressure of the prestressed tendon according to the experiment.

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定