国际工程中基准计划的编制-建筑经济 关键词] 国际工程,基准计划,编制,工期索赔 [gap=330]Key words: international project, baseline plan, preparing, EOT claim
基于90个网页-相关网页
另外要说的是基准计划更新的问题,每一次的更新都要求进度信息准确一致。
A further problem is that the updates of the programme require adequate and consistent progress information at each update.
同样还会计算比较基准计划完成日期和目前规划完成日期之间的差异,并显示在“完成时间差异”域中。
The variance is also calculated between the baseline finish dates and scheduled finish dates, shown in the Finish Variance field.
摘要:介绍ap1000三门项目首次倒送电的整体进度控制过程,并针对现场执行过程中执行计划与基准计划的偏差进行分析。
ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.