库1井直井段在完井测试期间, 2次测试井下封隔器均被埋死,造成非常严重的井下事故。
During the completion well testing period of the vertical well section of Ku 1, we tested 2 times and the downhole packer was all imbedded, result in very serious downhole accident.
根据垃圾填埋场的设计经验和清淤污泥的特性,工程采用提供侧限的堤坝式填埋方式,并且设置了雨水分流系统、渗滤液收集系统、封场处理和填埋气体导排系统。
According to the design for the refuse landfill and the property of dredged sediment, the lateral restraint dike will be adopted for the sediment landfill, and the rainwater diversion system.
应用推荐