最后进行施工结构打点试桩,在经过地质监理工程技术人员的检验合格后方可施工。
Finally, the construction of the construction of the test pile, in the geological supervision of the engineering and technical personnel after the construction of qualified.
珊溪水利枢纽工程地质条件复杂,光纤线路较长,自动化元器件分布较广,需要解决的技术问题很多。
Many problems need to be solved in the Shanxi Water Conservancy Project for complex geological conditions, long optical fiber lines and widely distributed automatic components.
文章介绍了在复杂地质条件下的隧洞光面爆破施工技术。此技术在水利工程中运用,取得了良好的效果。
The technique of tunneling by smooth blasting under complex geological conditions is presented and the technique gives good results in the water conservancy project.
应用推荐