挤密桩法地基处理在电力工程中广泛应用,特别是灰土挤密夯扩桩法。
The foundation treatment of compaction pile method is applied in many power plant projects, especially lime-soil compaction-expansion pile method.
现场检验表明,本文提出的采用灰土桩处理桥基湿陷性黄土地基是可行的。
The in-situ test result shows that using the lime-soil pile to treat the collapsible loess under the bridge is feasible.
结合灰土挤密桩处理湿陷性黄土地基工程实际进行了单桩、三桩复合地基静载荷现场试验。
The field loading test of single pile and three piles composite ground are studied combining the construction of lime-soil compacted pile in collapsible loess foundation.
应用推荐