跨逆断层的埋地管线在满足管顶最小覆土深度、土壤冰冻深度以及抗浮要求等前提下,以浅埋为宜。
While meeting the requirement of the minimum depth of the overlaying soil and the frozen depth, the cross-reverse fault pipeline is appropriate to be buried in shallow soil.
施工方法,采用专用设备对混 凝土桥面板表面浮浆进行铣刨、拉毛或凿毛、清扫、吹净处理;
Its synchronous construction process includes milling and planing the concrete bridge surface to roughen, cleaning and blasting with special apparatus;
应用推荐