在大斜坡区段,管线用沙袋或土袋锚固,固定块的上部和下部应压实牢固。
In high slope the pipeline is anchored with sand or soil bags and the upper and lower part of the block is compact solidly.
随着可编程图形硬件时代的到来,着色器替代了传统的固定渲染管线以实现更加逼真的图像效果。
With the era of programmable graphics hardware, shader replaces the traditional fixed rendering pipeline to achieve more realistic effects.
垂直安装时,可敷设在细钢绳上吊挂,并用金属夹具固定在钢架或其它管线上。
Vertical installation, can be laid in fine wire rope hung, and with a metal clamp is fixed on the frame or other pipeline.
应用推荐