双梁式整体提升法是一种新型的大型结构安装方法,主要由固定梁、活动梁、钢绞线、工作锚、工具锚、导向装置及千斤顶组成,与现在常用的安装方法相比,具有价廉、安全、高效和易推广等特点。
As a new installation method for big structures, double girder integral lift is mainly composed of fixed girder, moveable girder, work anchor, moveable anchor, jacks and guide rail.
利用文克尔局部弹性地基模型,求解均布荷载作用下一端固定的弹性地基梁的基底压力;
With Winkler foundation model, the foundation pressure on Winkler foundation-beam with one fixed end and subject to evenly distributed loading is calculated.
这类问题通常描述两端固定的弹性梁的形变。
This class of problems usually describes the deformations of elastic beams with both fixed points.
应用推荐