当新的呼梯盒和操作盘安装完毕后,将进行群控系统的安装。
New Landing and Car Operating Stations were installed and connected to the overlay control system.
控制信号面板呼梯蜂鸣器的延迟时间,如果提供了一个面板的话。
Controls delay of annunciator panel call pending buzzer if a panel is provided.
由于设计了一种独特的发射互锁环,有效地解决了多个楼层同时呼梯的冲突问题。
With an unique design of transmission lock out loop, the calling collision of multi users is overcome.
应用推荐