吸水井为水泵吸水管专门设置的构筑物。
射孔是完井工艺最后的一个环节,因此注水井射孔完井的优劣对其吸水能力的影响就显得十分重要。
Perforation is the last step of well completion, so injection well perforation completion has great influence on water absorbing capability.
水井注入压力升高,吸水剖面得到调整,层间矛盾得到改善;
The injection pressure rose, the injectivity profile and interlayer contradiction was modulated.
“你能够从水井里吸水,”帽匠说,“你也应该想到从糖浆井里能够吸糖浆了。怎么样,傻瓜?”
'You can draw water out of a water-well, ' said the Hatter; 'so I should think you could draw treacle out of a treacle-well-eh, stupid?'
应用推荐